Phronesis-Online
Immediate Zone (0–5 ft) –
Required
Create and maintain a 0–5 ft non‑combustible buffer around all structures and attachments.
Move woodpiles and other combustibles outside 0–5 ft.
Openings & Vents –
Required
Screen all vents with 1/8‑inch metal mesh.